Ballater, Q&A  

   ...Britains largest fully mutual Housing Co-operative

Home
Up

 

 

Download and Install Browsealoud  

 

   

Q1       You say this is a revolutionary way of building homes. What makes it so different from the current method of building houses?

The walls, roof and first floor are all made in the factory. The advantage is that you can control the quality to a much higher degree.

Q2       You say that the houses will be of higher quality. What makes them better than current UK housing?

A greater percentage of the house, including doors and windows, is manufactured off-site, in the controlled environment of the factory and therefore not dependent on weather. There is a significant reduction on brick-laying work on-site, which means there is a reduced drying out time and less moisture in the finished building when the tenant moves in.

Q3       Technically what is so different about these homes?

The construction of the roof and wall panels is different; all engineering is in the exterior walls and roof. Since there are no retaining interior walls, there is much more flexibility of space.

Q4       Are these homes designed to cater for the North East climate?

Yes, the unique construction method means that the houses are designed to keep the occupants warm and comfortable in the winter, yet cool and comfortable in the summer.

Q5       Do the homes comply with current planning and building regulations?

Yes. All these requirements were thoroughly researched before we committed ourselves to the product.

Q6       You say you can save time with this method and get people into their homes more quickly. How much more quickly will homes be built?

The answer is complex, but put simply, these houses will be built 25% more quickly than a comparable timber-framed kit.

Q7       You say that these homes can be built with semi-skilled labour. Are there ramifications on the quality?

The industrial process using advanced technology makes for better quality components than even skilled labour can produce.

Q8       Does the use of semi-skilled labour not undermine the current construction labour market?

There is currently an acute shortage of skilled labour so this does not put any more pressure on the labour market.

Q9       How do you know that tenants will like the houses?

Our tenants appreciate high quality houses and in that regard there is no difficulty. Homeowners rate brick-built houses as their top choice and these precision built brick houses already have an excellent reputation in Europe .

Q10     If this system is so good, why are we not already using it in the U.K. ?

The Egan report identifies that the industry has been slow to adapt to off-site construction. This system is common in Europe .

Q11     What are the economics behind importing housing from Europe ?

The quality of the product is such that we were very keen to conduct the pilot scheme although there are penalties in the cost and in the exchange rate. In the long term we need a factory in Scotland .

Q12     You say they are more economical to run than current houses. In what way are they more economical?

In terms of energy use, these houses are designed to achieve high levels of energy efficiency. All the components are to a high spec, and we estimate that the cost of maintenance over the houses’ 100-year life is less than that of traditionally built houses. For example, we are much more confident that this type of house will sustain its SAP rating – the measure of the cost of heating a house – as it’s air-tight construction means there are no draughts. That means lower heating bills to the customer.

Q13     How sustainable a building method is this?

There is little difference in the core components used for these homes, compared with other forms of housebuilding. However, the way these components are drawn together does mean there is significant reductions in fuel usage on transporting materials to and from site.   Longevity is 100-years plus, and the houses are adaptable to people’s changing needs, which make them good for rural and urban societies alike. There is virtually no waste in production, in comparison with timber kits, where the wasteage can be high. Running costs are low and they are wholly recyclable?

Q14     How much do they cost?

This is a pilot project, so initial capital cost is only part of the rationale. Each 4 apartment house is costing around  £100,000. Using the traditional housebuilding methodology an equivalent house would cost about £80,000, so if we discount the 100 year longevity, these homes appear to be 20% more expensive at this stage.  There are two reasons for this: the cost of transport from Holland , and the fact that we are using an unfamiliar technology. In the long term the houses will become cheaper, as the technology is utilised in the UK . It should be borne in mind that the first timber-framed kits were very expensive. However, when you do the “whole life costing” assessment and the ability of the product to require less maintenance over a longer period, that perceived financial imbalance is very soon eroded.

Q15     Are there any other advantages associated with the use of this method of house building?

These houses are:

* quicker to build

* not dependent on the weather

* more fire-resistant

* draught-free

* incredibly adaptable

* quiet to live in

* more durable than timber kits

Q16     What happens if there is a defect in these homes?

There are fewer defects in these houses than in traditionally built houses, because of the quality control – any defect is detected in the factory. Once they are on-site, any problem is minor and easily rectified. They are then checked on assembly.

Q17:  How easily can these homes be adapted in the future?

Adaptability is one of the great benefits. The ground floors are designed for wheelchair use and there is a toilet and sleeping accommodation there. The internal partitions can all be removed and relocated for maximum flexibility. Theoretically, the house can be unbolted and moved anywhere.

Q18:   You are building semi-detached homes here; can the system cater for flats and/or individual homes?

They are ideal as flats or individual homes because of their structural strength, and the fact that they are more fire-resisitant.

Q19     What response do you think you will get from private lenders for this type of housing?

The response has been good. The quality of the product has impressed lenders.

Q20     What has been the industry’s response to this new approach?

There is wide acceptance at a political and industry level that there needs to be a step change in the way housing is delivered. The whole purpose of the pilot is to promote more modern methods of construction and to play a part in delivering that change. This initiative will highlight the strength of this technology for the construction industry and the general public.  The entire process is safer. On site, the building envelope goes up quickly and allows other fitting-out work to continue under cover more quickly.

Q21     Will you be building more of these homes?

Yes, we are interested in building on unencumbered sites, where the technology can be utilised to its optimum. In this instance we were using an existing site, and planning was already in place. The building process involved can easily be adapted for both standard as well as bespoke designs. It is hugely flexible.

Q22 Why has this particular area been chosen for the pilot?

The site was a “planning gain” site in a rural area. We believe that the technology lends itself well to providing small scale housing developments in rural area as well as large scale developments. Building small scale developments in rural areas can be expensive with difficulty in accessing economies of scale. If we can design a a few house types which suit the vernacular architecture of an area we can buy in bulk with the actual houses being built in different villages.

Q23 How have/how will, the tenants be selected?

Three of the houses will be allocated to applicants from the Council’s waiting list. The other two will have been allocated directly by Tenants First. To ensure equality of access Tenants First placed an advert in the local press inviting people to apply. We received over ten applications for each house.

Q24 How is the pilot funded?

The pilot is being funded jointly by Communities Scotland and Tenants First. Communities Scotland is contributing Housing Association Grant using its standard benchmarks. Tenants First is meeting the “normal “ contribution to a Housing Association Grant funded scheme and the additional construction costs.

Q25 How are the homes being transported?

They are being transported by specialist lorries by road and ferry.

Q26 How will they be erected?

Tenants First has entered into a partnering contract with Mansell. Mansell have worked alongside the professional team retained by Tenants First to ensure they understand the technology.

An adviser from the Dutch factories will be on site for the erection of the first house as an aid for the builders.

Q27 Residents of the estate where the houses will be built claim they were under the impression that the houses would be for sale and not for rent. Can you clear up this misunderstanding?

The confusion appears to have arisen from the assumption that the affordable houses were to be for sale. In fact in planning law is tenure neutral and the phrase therefore refers to both rental and sale.

Ballater is a pressured market for affordable rented housing. This is partly because of its attraction as a location for both holiday and retirement homes. Local people can find it difficult to compete with the financial firepower of incoming residents.

As a result Aberdeenshire Council insisted that the houses be made available for rent.

Q28 How will the homes appear in comparison to the others on the estate?

Tenants First  are bound by the planning consent for the whole estate. The new houses will therefore match the appearance of the existing houses. This means that despite the houses being fully finished in brick they will be harled after they are erected to comply with the planning consent.

 

 

Google

 
WWW www.tenantsfirst.com

Maestro logo Solo logo

Home | Disclaimer/Privacy | Contact Us | Complaints

 

Registered Office: 23 Albert Street, Aberdeen, AB25 1XX

Registered under the Industrial and Provident Societies Act 1965 No 2388R(S)

Tel: (+44) 01224 628400 Fax: (+44) 01224 628428

Investor in people logo. Click here to visit their website

Delta logo Visa Electron logo
Questions or problems regarding this web site should be directed to info@tenantsfirst.com
Last modified: 29 September, 2008 .
Copyright © 2007 Tenants First Housing Co-operative Ltd