Choices Concept  

   ...Britains largest fully mutual Housing Co-operative

Home
Up

 

 

Download and Install Browsealoud  

 

   

The Co-operative has a programme for major works to all its properties, but we recognise that there are times when members might want work done before it is scheduled. That’s why, in April 2008 we’re introducing our new “Choices” concept for kitchen replacements.

These are the principals behind the scheme.

1. Typically a kitchen refurbishment costs the Co-operative ~£3,500. This work involves;

bullet

Designing kitchen layouts on an individual basic.

bullet

Removing and laying aside, ovens, fridges etc.

bullet

Stripping out the existing kitchen units.

bullet

1st fix plumbing and electrical.

bullet

Installing new kitchen units.

bullet

2nd fix Plumbing (sink, washing machine etc.)

bullet

2nd fix Electrical (replacing existing sockets and installing additional sockets etc as required.)

bullet

Making good walls.

bullet

Tiling all walls above worktops, up to the underside of wall units.

bullet

Reinstalling fridges, cooker, washing machine etc.

On average

bullet

Material costs £1,500

bullet

Labour and other costs £2,000

2. Currently we expect kitchens on average to last for 20 years.

3. The early replacement of a kitchen has the following effect on the Co-operative;

bullet

The early loss of an asset (either now or at the next replacement)

bullet

The early spending of our cash reserve.

4. To be fair to all Members, the Co-operative must recover these losses from the Member wanting us to replace the kitchen early, on the following basis;

 
bullet

Asset loss, equals 1/20 of the cost for every year before the original replacement date.

E.g. A kitchen replaced 5 years before schedule

5/20 x £3,500 = £875

bullet

Early spend of Cash, equals 6.87% of our spend for every year before the original replacement date

E.g. A kitchen replaced 5 years before schedule

6.87% x £3,500 x 5 = £1,202

Therefore the total to be recovered is

= £2,077

If this is recovered over 5 years (60 Months)

= £34.62 per month

5. To reduce the risk of loss to the Co-operative, to be eligible Members must have a stable rent account. I.e. not received a rent arrears letter for 2 years, or a Notice of Proceedings’ for 5 years.

6. A Direct Debit agreement must be set up for the repayment of the costs.

7. Where a Member wishes to replace the kitchen themselves, upon completion of the work the Co operative will pay towards the replacement on the following basis;
We will calculate the potential payment (up to £3,500) by;

 
bullet Calculating the expected replacement date of your kitchen based on our assessment of its quality and history of replacements in your home. If for example, a kitchen with a 15 year life was fitted 5 years before our expected replacement date. This would extend 10 years into the life of the kitchen that we would have fitted. 

We will then pay you 10/20 of £3,500

= £1,750

Less the cost of the early spend of Cash, as above

E.g. 5 years before schedule

6.87% x £1,750 x 5 = £601

Therefore the total to payment is 

 = £1,149

In this case you will be totally responsible for the maintenance of your kitchen up to its expected replacement date.

8. The number of participants will be limited in the first year

If you wish to participate in the scheme please contact Hugh Crothers, Property Manager for further details.

 

 

Google

 
WWW www.tenantsfirst.com

Maestro logo Solo logo

Home | Disclaimer/Privacy | Contact Us | Complaints

 

Registered Office: 23 Albert Street, Aberdeen, AB25 1XX

Registered under the Industrial and Provident Societies Act 1965 No 2388R(S)

Tel: (+44) 01224 628400 Fax: (+44) 01224 628428

Investor in people logo. Click here to visit their website

Delta logo Visa Electron logo
Questions or problems regarding this web site should be directed to info@tenantsfirst.com
Last modified: 29 September, 2008 .
Copyright © 2007 Tenants First Housing Co-operative Ltd